Differences between revisions 2 and 3
Revision 2 as of 2013-11-18 18:10:11
Size: 1480
Editor: snehalkc
Comment:
Revision 3 as of 2013-11-18 19:36:27
Size: 2454
Editor: snehalkc
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
   * Imaging specifications
     * Jason, Craig and Snehal will test a few imaging protocols on Nov 14th.
   * Registration specifications and specimen preparation specifications.
     * Jason prepared a flowchart to describe the registration and initialization workflow.
     * Some changes were suggested to the flowchart. Change Opto (optotrack) to mocap (motion capture). Move T(Rob,Opto) to step 7. Change Anat to Anati.
     * Linking across the two specification pages needs to be clear.
     * Specimen preparation will be updated with all the information and registration math can be moved to later.
     * End dates will be updated.
   * Joint testing specifications
     * Tibiofemoral joint testing specifications are in usable form.
      * Equipment use modes were updated by Robb.
      * Initialization will be changes to coordinate system optimization to avoid confusion.
      * Repeatability testing stages were added.
      *
     

Recurring Meeting of Cleveland Clinic Core Team

Date: Nov 12, 2013

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Jason Halloran
  3. Craig Bennetts
  4. Snehal Chokhandre
  5. Robb Colbrunn
  6. Tara Bonner

Agenda:

  1. Discuss tasks progress.(Finalize specimen specification to order specimens).
  2. Discuss/finalize tissue testing equipment purchase.
  3. Decide tasks for the next meeting.
  4. Other

Immediate action items:

Notes:

  1. Discuss tasks progress.(Finalize specimen specification to order specimens).
    • Creation of tasks and Wiki pages was discussed.
    • Specimen specification
      • Snehal ordered two specimens (old, male and female, hip to toetips). Radiographs will be obtained for the specimens before finalizing the specimens.
      • More specimens will be procured as specifications evolve.
    • The issues related to mechanical testing (pressure sensor calibration, Optotrak issues etc.) need to be resolved before the testing can be done successfully.
    • Target test date for joint testing is set for last week of January 2014 or first week of February 2014.
    • At the end of first year (May 31st,2014) first specimen data collected and disseminated and modeling specifications need to be complete.
    • More specimens will be tested after first model built.
    • Imaging specifications
      • Jason, Craig and Snehal will test a few imaging protocols on Nov 14th.
    • Registration specifications and specimen preparation specifications.
      • Jason prepared a flowchart to describe the registration and initialization workflow.
      • Some changes were suggested to the flowchart. Change Opto (optotrack) to mocap (motion capture). Move T(Rob,Opto) to step 7. Change Anat to Anati.
      • Linking across the two specification pages needs to be clear.
      • Specimen preparation will be updated with all the information and registration math can be moved to later.
      • End dates will be updated.
    • Joint testing specifications
      • Tibiofemoral joint testing specifications are in usable form.
        • Equipment use modes were updated by Robb.
        • Initialization will be changes to coordinate system optimization to avoid confusion.
        • Repeatability testing stages were added.

RecurringMeetings/2013-11-12 (last edited 2016-05-04 22:09:48 by localhost)