Differences between revisions 2 and 3
Revision 2 as of 2013-12-03 22:29:38
Size: 969
Editor: snehalkc
Comment:
Revision 3 as of 2013-12-09 21:06:21
Size: 4139
Editor: snehalkc
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
'''Agenda:'''
 
 1. Discuss tasks progress.
 2. Discuss specimen transportation device design and options.
 3. Decide date for Biomomtum Inc. engineer's visit.
 4. Decide tasks for the next meeting.
 5. Other
Line 39: Line 47:

 1. Discuss task progress.
    * Immediate action items were discussed.
      * Robb will prepare information regarding data files and data structures and update the necessary information.
      * Snehal updated the image specifications page with more images for the 3D DESS sequence and contacted Shannon at UH for programming the 3D DESS and MESE sequences on the 3T machine.
      * Few material samples were obtained to find an alternative to the brass marker components. Options were discussed later in the meeting.
      * Jason will contact Dr. Winalski to discuss the images obtained at the testing session.
      * Last meeting minutes were briefly discussed.
      * Jason and Robb will address the queries in joint testing specifications.
    * Imaging specifications.
      * The T2 proton density sequence will not be used.
      * The 3D DESS sequence works well for cartilage and meniscus. PCL was also clearly visible in the images (the specimen was ACL deficient).
      * Snehal will request the UH engineers to program the 3D DESS and MESE sequences before the next imaging session.
      * Material samples for marker components will also be imaged.
      * The glass filled nylon and ultem will be easier to machine and put threads in.
      * The patella marker assembly will be modified to a lighter design.
    * Robotics testing specifications.
      * Robb will update the data structure data file information and Jason will update the patellofemoral joint testing information.
    * Preparation for specimen testing and registration specifications.
      * Ahmet will go over the information and update the pages.
    * Tissue testing specifications.
      * Snehal will obtain a tendon sample and will try to cut and prepare the test sample.
    * Pressure sensor calibration
      * Jason will contact tekscan to inquire about the sensors.
    * Scott is working on the generation 1 manuscript and will provide a preliminary document to Ahmet by Dec 15th.

 
 2. Discuss specimen transportation device design and options.
    * Craig will obtain the foam and pvc samples to design device prototype.

 3. Decide date for Biomomtum Inc. engineer's visit.
    * Dec 18th was chosen by the team. A 4 hour slot will be sufficient for the demonstration.
    * Robb will confirm the visit details and will also obtain quotes for the three machine configurations.
    * Some biological and non biological samples will be prepared to be tested on the machine.

 4. Decide tasks for the next meeting.
    * See immediate action items and notes above for details.

 5. Other
    * All the FEBio development material will be kept limited to the project members for now.
    * Ahmet added 'include page' feature to the in situ strain feature development page. This allows to link text from one page to another and modifications to the parent page will reflect to the linked pages.

Recurring Meeting of Cleveland Clinic Core Team

Date: December 3, 2013

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Jason Halloran
  3. Craig Bennetts
  4. Snehal Chokhandre
  5. Robb Colbrunn
  6. Tara Bonner

Agenda:

  1. Discuss tasks progress.
  2. Discuss specimen transportation device design and options.
  3. Decide date for Biomomtum Inc. engineer's visit.
  4. Decide tasks for the next meeting.
  5. Other

Immediate Action Items:

  • Snehal

    • Send Biomomentum machine configurations list to Robb.

    Robb

    • Request quotes from Biomomentum.

    Craig

    • Get foam and PVC samples needed for specimen transportation device prototype design.

    Craig, Jason and Snehal

    • Meet this week to test the foam samples and come up with a few design options.

    Ahmet

    • Review registration and specimen preparation specifications.

    Robb and Jason

    • Make necessary edits to joint testing specifications.

    Snehal

    • Obtain tendon sample.

Notes:

  1. Discuss task progress.
    • Immediate action items were discussed.
      • Robb will prepare information regarding data files and data structures and update the necessary information.
      • Snehal updated the image specifications page with more images for the 3D DESS sequence and contacted Shannon at UH for programming the 3D DESS and MESE sequences on the 3T machine.
      • Few material samples were obtained to find an alternative to the brass marker components. Options were discussed later in the meeting.
      • Jason will contact Dr. Winalski to discuss the images obtained at the testing session.
      • Last meeting minutes were briefly discussed.
      • Jason and Robb will address the queries in joint testing specifications.
    • Imaging specifications.
      • The T2 proton density sequence will not be used.
      • The 3D DESS sequence works well for cartilage and meniscus. PCL was also clearly visible in the images (the specimen was ACL deficient).
      • Snehal will request the UH engineers to program the 3D DESS and MESE sequences before the next imaging session.
      • Material samples for marker components will also be imaged.
      • The glass filled nylon and ultem will be easier to machine and put threads in.
      • The patella marker assembly will be modified to a lighter design.
    • Robotics testing specifications.
      • Robb will update the data structure data file information and Jason will update the patellofemoral joint testing information.
    • Preparation for specimen testing and registration specifications.
      • Ahmet will go over the information and update the pages.
    • Tissue testing specifications.
      • Snehal will obtain a tendon sample and will try to cut and prepare the test sample.
    • Pressure sensor calibration
      • Jason will contact tekscan to inquire about the sensors.
    • Scott is working on the generation 1 manuscript and will provide a preliminary document to Ahmet by Dec 15th.
  2. Discuss specimen transportation device design and options.
    • Craig will obtain the foam and pvc samples to design device prototype.
  3. Decide date for Biomomtum Inc. engineer's visit.
    • Dec 18th was chosen by the team. A 4 hour slot will be sufficient for the demonstration.
    • Robb will confirm the visit details and will also obtain quotes for the three machine configurations.
    • Some biological and non biological samples will be prepared to be tested on the machine.
  4. Decide tasks for the next meeting.
    • See immediate action items and notes above for details.
  5. Other
    • All the FEBio development material will be kept limited to the project members for now.
    • Ahmet added 'include page' feature to the in situ strain feature development page. This allows to link text from one page to another and modifications to the parent page will reflect to the linked pages.

RecurringMeetings/2013-12-03 (last edited 2016-05-04 22:09:48 by localhost)