Differences between revisions 9 and 10
Revision 9 as of 2014-09-09 15:47:50
Size: 1543
Editor: aerdemir
Comment:
Revision 10 as of 2014-09-16 11:48:42
Size: 2749
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 45: Line 45:
  * TBD   * Tara noted that Robb conducted comparison of pre- and post-experiment calibration comparison. Robb uploaded the results to the Midas platform (comparison of peak pressures) along with the post-experiment calibration file. Robb also updated the wiki page relevant to pressure sensor calibration. Tara noted that Robb and Martin (from Biomomentum Inc.) have been discussing Mach-1 data acquisition issues.
  * Tara updated oks004 wiki page to provide a description on why unexpected translations occurred during anterior-posterior laxity testing. She also noted that this issue will be resolved during next round of testing by raising controller gains and allowing more time for the robot to settle at the desired loads. oks004 data should be referred as "anterior-posterior dominant loading" rather than "anterior-posterior laxity".
  * Craig renamed MR identify separate sequences and put them in separate folders in Midas.
  * Craig committed video reduction script to downsample video data acquired by using the Mach-1 tissue testing system.
Line 48: Line 51:
  * Ahmet will help Snehal to accommodate large volume tissue testing.
Line 52: Line 56:
  * Schedule joint level testing for every month until June 2015.   * Schedule joint level testing for every month until June 2015. Snehal will coordinate with the Open Knee(s) team and collaborating groups for scheduling.

Recurring Meeting of Cleveland Clinic Core Team

Date: September 9, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Craig Bennetts
  3. Snehal Chokhandre
  4. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Discuss tissue mechanical testing related issues.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

  • Robb & Snehal

    • Follow-up with Biomomentum Inc. to resolve data collection issues in Mach-1.
  • Craig & Ahmet

    • Following Open Knee(s) - Generation 1 performance evaluation with FEBio version 2.0, meet to decide pathways to upgrade model scripting approaches.
  • Ahmet
    • Test user privilege setting to move folders/files in Midas platform.
  • Snehal
    • Upload collected oks004 tissue testing data to in-house Midas platform.
    • Provide tissue testing issues, deviations, etc. in oks004 wiki page.
    • Contact XYZ Scientific to upgrade to Truegrid version 3.0.
  • All
    • Evaluate MR images of oks004.

Notes:

  1. Discuss immediate action items from the last meeting.
    • Tara noted that Robb conducted comparison of pre- and post-experiment calibration comparison. Robb uploaded the results to the Midas platform (comparison of peak pressures) along with the post-experiment calibration file. Robb also updated the wiki page relevant to pressure sensor calibration. Tara noted that Robb and Martin (from Biomomentum Inc.) have been discussing Mach-1 data acquisition issues.
    • Tara updated oks004 wiki page to provide a description on why unexpected translations occurred during anterior-posterior laxity testing. She also noted that this issue will be resolved during next round of testing by raising controller gains and allowing more time for the robot to settle at the desired loads. oks004 data should be referred as "anterior-posterior dominant loading" rather than "anterior-posterior laxity".
    • Craig renamed MR identify separate sequences and put them in separate folders in Midas.
    • Craig committed video reduction script to downsample video data acquired by using the Mach-1 tissue testing system.
  2. Discuss tissue mechanical testing related issues.
    • TBD
    • Ahmet will help Snehal to accommodate large volume tissue testing.
  3. Decide immediate action items for the next meeting.
    • TBD
  4. Other.
    • New specimen arrived, a wiki page needs to be created for it, e.g. oks005.
    • Schedule joint level testing for every month until June 2015. Snehal will coordinate with the Open Knee(s) team and collaborating groups for scheduling.

RecurringMeetings/2014-09-09 (last edited 2016-05-04 22:09:52 by localhost)