Recurring Meeting of Cleveland Clinic Core Team

Date: September 9, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Craig Bennetts
  3. Snehal Chokhandre
  4. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Discuss tissue mechanical testing related issues.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

Notes:

  1. Discuss immediate action items from the last meeting.
    • Tara noted that Robb conducted comparison of pre- and post-experiment calibration comparison. Robb uploaded the results to the Midas platform (comparison of peak pressures) along with the post-experiment calibration file. Robb also updated the wiki page relevant to pressure sensor calibration. Tara noted that Robb and Martin (from Biomomentum Inc.) have been discussing Mach-1 data acquisition issues.
    • Tara updated oks004 wiki page to provide a description on why unexpected translations occurred during anterior-posterior laxity testing. She also noted that this issue will be resolved during next round of testing by raising controller gains and allowing more time for the robot to settle at the desired loads. oks004 data should be referred as "anterior-posterior dominant loading" rather than "anterior-posterior laxity".
    • Craig renamed MR identify separate sequences and put them in separate folders in Midas.
    • Craig committed video reduction script to downsample video data acquired by using the Mach-1 tissue testing system.
  2. Discuss tissue mechanical testing related issues.
    • TBD
    • Ahmet will help Snehal to accommodate large volume tissue testing.
  3. Decide immediate action items for the next meeting.
    • Action items were discussed and agreed upon. See Immediate Action Items above.
  4. Other.
    • New specimen has arrived, a wiki page needs to be created for it, e.g. oks005.
    • Schedule joint level testing for every month until June 2015. Snehal will coordinate with the Open Knee(s) team and collaborating groups for scheduling.