Differences between revisions 8 and 9
Revision 8 as of 2014-11-25 16:13:34
Size: 2261
Editor: aerdemir
Comment:
Revision 9 as of 2014-11-25 16:15:23
Size: 2498
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 30: Line 30:
 * Ahmet
  * If necessary, before oks003 testing, update specifications based on recommendations provided in previous Open Knee(s) specimen pages.
Line 37: Line 39:
 * Snehal and Tara
  * Evaluate the laboratory supplies for oks003 testing readiness.

Recurring Meeting of Cleveland Clinic Core Team

Date: November 25, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Craig Bennetts
  3. Snehal Chokhandre
  4. Robb Colbrunn
  5. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Discuss preparations for oks003 testing.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

  • Ahmet
    • If necessary, before oks003 testing, update specifications based on recommendations provided in previous Open Knee(s) specimen pages.
  • Robb
    • Check whether freezers are in emergency power supply and explore contingency plans in case of a freezer or power failure.
    • Explore a mechanism to report the version of SimVitro used to collect each data set during joint testing; for now provide the current version of the software.

  • Snehal
    • Schedule a meeting with Andrew (Derwin Laboratory), Tony (Prototype Shop), and Robb to build another tissue thickness measurement system.
    • Contact Jack Andrish to schedule dissection.
    • Contact Shannon (University Hospitals) to confirm scheduling of imaging.
  • Snehal and Tara
    • Evaluate the laboratory supplies for oks003 testing readiness.

Notes:

  1. Discuss immediate action items from the last meeting.
    • TBD
  2. Discuss preparations for oks003 testing.
    • Before oks003 testing starts, Ahmet will go all previous specimen pages to update specifications based on recommendations provided there.
    • Workload and schedule for joint level testing was discussed.
      • Snehal will take knee out at 9:00 AM on Sunday (November 30, 2014)
      • Specimen preparation will start at 9:00 AM on Monday led by Tara (December 1, 2014)
    • The team will meet at 8:30 AM on Tuesday for imaging preparation led by Craig (December 2, 2014)
    • The specimen will be aimed to be ready for tibiofemoral joint testing (led by Tara) at 1:00 PM on Tuesday (December 2, 2014)
    • Ahmet and Robb will meet, early morning on Wednesday (7:00 AM) to start patellofemoral joint testing (December 3, 2014). Ahmet will seal the sensor on Monday (4:00 PM, November 30) and Robb will the pressure sensor on Tuesday morning when others are at imaging (10:00 AM, December 2, 2014)
  3. Decide immediate action items for the next meeting.
    • TBD
  4. Other.
    • TBD

RecurringMeetings/2014-11-25 (last edited 2016-05-04 22:09:51 by localhost)