Differences between revisions 9 and 10
Revision 9 as of 2015-03-04 14:21:38
Size: 1663
Editor: aerdemir
Comment:
Revision 10 as of 2015-03-05 23:26:20
Size: 2640
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 34: Line 34:
  * Explore tuning of tissue testing system to get ideal ramp loading behavior   * Explore tuning of tissue testing system to get ideal ramp loading behaviour.
Line 38: Line 38:
  * Provide comments on introduction of the pivot shift manuscript   * Provide comments on the introduction of the pivot shift manuscript.
Line 46: Line 46:
Line 50: Line 49:
  * TBD   * Robb drafted the abstract on patellofemoral joint testing for ASB 2015. Tara, Ahmet, and Snehal already reviewed it. Robb will communicate with Craig and Jason to get their feedback and submit.
  * Craig is almost finished implementing many additional features for pre-processing of Open Knee(s) - Generation 1 model for the pivot shift study. He still needs to put sample magnetic resonance images for oks007.
  * Snehal drafted the introduction for the pivot shift manuscript. Additional details were discussed as part of the specific agenda item below.
  * Snehal found a detailed article on comparison of various tissue thickness measurement approaches. She provided the link to the article in the relevant wiki page. Snehal and Craig will evaluate and work on the camera-based thickness measurement system as time permits.
  * Snehal uploaded any photos she has for the experimentation. Ahmet needs to provide photos he took for oks007.
Line 54: Line 57:
  * TBD   * See Immediate Action Items above.

Recurring Meeting of Cleveland Clinic Core Team

Date: March 3, 2015

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Craig Bennetts
  3. Snehal Chokhandre
  4. Robb Colbrunn
  5. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Finalize introduction and methods section development for pivot shift manuscript.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

  • Craig
    • Put sample MR images for oks007 on wiki.
    • Try to run pivot shift simulations to evaluate convergence characteristics.
  • Snehal and Robb
    • Explore tuning of tissue testing system to get ideal ramp loading behaviour.
  • Snehal
    • Test tissue samples at 20%/s and 100%/s rates to evaluate testing capabilities.
  • Robb, Tara and Ahmet
    • Provide comments on the introduction of the pivot shift manuscript.
  • Snehal
    • Incorporate comments by the team on the introduction of the pivot shift manuscript and submit to Paul Saluan for review.
  • Robb and Craig
    • Write draft of pivot shift loading trajectory section for the methods of pivot shift manuscript.
  • Ahmet
    • Write draft of model, simulation scenarios, and outputs for the methods of pivot shift manuscript.

Notes:

  1. Discuss immediate action items from the last meeting.
    • Robb drafted the abstract on patellofemoral joint testing for ASB 2015. Tara, Ahmet, and Snehal already reviewed it. Robb will communicate with Craig and Jason to get their feedback and submit.
    • Craig is almost finished implementing many additional features for pre-processing of Open Knee(s) - Generation 1 model for the pivot shift study. He still needs to put sample magnetic resonance images for oks007.
    • Snehal drafted the introduction for the pivot shift manuscript. Additional details were discussed as part of the specific agenda item below.
    • Snehal found a detailed article on comparison of various tissue thickness measurement approaches. She provided the link to the article in the relevant wiki page. Snehal and Craig will evaluate and work on the camera-based thickness measurement system as time permits.
    • Snehal uploaded any photos she has for the experimentation. Ahmet needs to provide photos he took for oks007.
  2. Finalize introduction and methods section development for pivot shift manuscript.
    • TBD
  3. Decide immediate action items for the next meeting.
    • See Immediate Action Items above.
  4. Other.
    • TBD

RecurringMeetings/2015-03-03 (last edited 2016-05-04 22:09:50 by localhost)