Size: 1934
Comment:
|
Size: 2223
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 51: | Line 51: |
* | * Meet with Connor, Diana, and Raghav to describe implementation of springs in the Open Knee(s) - Generation 1 file. * Raghav * Troubleshoot installation of SimpleCV. * Work with Snehal on background and lighting of the specimen for minimizing uncertainties in thickness measurement. |
Recurring Meeting of Cleveland Clinic Core Team
Date: June 30, 2015
Time: 10:30 AM EST
Means: In person meeting
Attendees:
- Ahmet Erdemir
- Snehal Chokhandre
- Robb Colbrunn
- Tara Bonner
- Omar Gad
- Connor Lough
- Diana Suciu
- Raghav Malik
Agenda:
- Discuss immediate action items from the last meeting.
- Mid-term presentations by research students.
- Decide immediate action items for the next meeting.
- Other.
Immediate Action Items:
- Ahmet
- Update/review geometry generation specifications to accommodate smooth STL generation.
- Craig
- Provide sample MR images for oks008 in the relevant wiki page.
- Snehal
- Continue testing all tissue types at 20%/s to evaluate the capacity for a simplified testing scheme (for next two weeks).
- Send Ahmet online site to buy a camera for optical measurement system.
- Robb
- Conduct post-experiment calibration of pressure sensor used for oks008 testing.
- Connor
- Continue segmenting registration markers.
- Move registration marker segmentation files to appropriate specimen folders with appropriate labeling.
- Update wiki to analyze patella registration marker analysis.
- Diana
- Work with Robb to conduct verification of contact pressure analysis with Robb and Tara (using Tekscan original files).
- Update wiki to include patellofemoral joint kinematics/kinetics.
- Rename segmented volumes from oks001 and oks002 and place in relevant folder in source code repository.
- Omar
- Meet with Connor, Diana, and Raghav to describe implementation of springs in the Open Knee(s) - Generation 1 file.
- Raghav
- Troubleshoot installation of SimpleCV.
- Work with Snehal on background and lighting of the specimen for minimizing uncertainties in thickness measurement.
Ongoing Action Items:
- TBD
- TBD
Notes:
- Discuss immediate action items from the last meeting.
- TBD
- Mid-term presentations by research students.
- TBD
- Decide immediate action items for the next meeting.
- TBD
- Other.
- TBD