Time Range Problem?

Provide easy-to-use, extensible software for modeling, simulating, controlling, and analyzing the neuromusculoskeletal system.
POST REPLY
User avatar
Rahul Gharate
Posts: 8
Joined: Thu Nov 07, 2019 10:05 pm

Time Range Problem?

Post by Rahul Gharate » Sat Nov 16, 2019 7:25 am

The time range for 100% gait cycle is --> 0.6 -1.9 . I have provided path actuator with 43% actuation to the gait 2354 model. When I went for CMC process and loaded the files but I got the time range as 0.75 - 1.2 sec.
But I want to change the time range as 0.6 - 1.9. I have tried to change manually but I didn't get it.
How I can change the time range?
Please Help.

Tags:

User avatar
Dimitar Stanev
Posts: 1096
Joined: Fri Jan 31, 2014 5:14 am

Re: Time Range Problem?

Post by Dimitar Stanev » Sat Nov 16, 2019 12:04 pm

It is possible that the input kinematics to the CMC tool have a time range between .75 and 1.2.

User avatar
Rahul Gharate
Posts: 8
Joined: Thu Nov 07, 2019 10:05 pm

Re: Time Range Problem?

Post by Rahul Gharate » Sun Nov 17, 2019 12:09 am

Respected Sir,
How I can change this time range ?
Please Help.

User avatar
Dimitar Stanev
Posts: 1096
Joined: Fri Jan 31, 2014 5:14 am

Re: Time Range Problem?

Post by Dimitar Stanev » Sun Nov 17, 2019 2:42 am

Open the kinematics file with an editor and check the first column, which is time.

User avatar
Rahul Gharate
Posts: 8
Joined: Thu Nov 07, 2019 10:05 pm

Re: Time Range Problem?

Post by Rahul Gharate » Sun Nov 17, 2019 6:11 am

Thank you so much.

User avatar
Rahul Gharate
Posts: 8
Joined: Thu Nov 07, 2019 10:05 pm

Re: Time Range Problem?

Post by Rahul Gharate » Sun Nov 17, 2019 9:12 am

I have change this actuation timing and set from 0.6-1.9 but when I ran the CMC process it shows me "tool execution failed & output files weren't written" error.
Can you give me any sample file for gait 2354 model after providing path actuator.
Please help

POST REPLY