Cost Function in CMC....
Posted: Tue Aug 25, 2009 2:05 pm
Hi,
During CMC, is a single cost function used for the entire model (both sides) or does the source code allow us to modify the cost function for a subsection of the model, like specify different functions for the right or left side or even for each joint??? Thanks!!
Ananth
During CMC, is a single cost function used for the entire model (both sides) or does the source code allow us to modify the cost function for a subsection of the model, like specify different functions for the right or left side or even for each joint??? Thanks!!
Ananth