How can I terminate FD integration before the final time?
Posted: Thu Apr 11, 2013 5:02 pm
Hi everyone
I am an API user and I was wondering if there is a way to terminate forward dynamic integration before reaching to the preset "Final Time".
For example is there any way to terminate the integration if a parameter (e.g hip angle) reaches to a limit value?
Thanks
Sina
I am an API user and I was wondering if there is a way to terminate forward dynamic integration before reaching to the preset "Final Time".
For example is there any way to terminate the integration if a parameter (e.g hip angle) reaches to a limit value?
Thanks
Sina