Line 29: Line 29:
  See notes for details. See notes for details.
Line 47: Line 47:
  * Ahmet scheduled meetings with the advisory board.
  * Ahmet, Jason, Snehal will meet Dr. Winalski on Monday, October 28th at 7.00 am.
  * Ahmet scheduled meetings with the Advisory Board during the week of October 28, 2013.
  * Ahmet, Jason, Snehal will meet Dr. Winalski on Monday, October 29, 2013 at 8:00 AM. Dr. Winalski can provide insight on anatomical imaging
Line 51: Line 51:
   * Specimen selection criteria was decided.
   * Snehal will update the specifications and order the specimens this week, if possible.
   * Check exclusion criteria from previous orders.
   * Specimen selection criteria was decided upon. Exclusion criteria from previous orders will also be checked.
   * Snehal will update the specifications and if possible, order the specimens this week.
Line 55: Line 54:
   * Sub-sample details will be update as the other specifications development progresses.    * Sub-sample details will be updated later pending development of other experimentation specifications.
Line 57: Line 56:
   * Craig updated the page with previously used specifications.
   * Craig found relevant references to improve the specifications to better suit out needs.
   * Different sets of acquisition settings will be tested.
   * Different imaging sequences might be used to get images that might be easier to segment semi-automatically.
   * Ahmet and Jason will meet Chris on 28th.
   * A workable version of the imaging setting will be decided before the meeting.
   * Registration markers placement etc information should be included in specimen preparation.
   * Craig updated the page with previously used MRI specifications.
   * Craig found relevant references to improve the specifications to better suit segmentation constraints. In this regard, different sets of acquisition settings will likely be tested. Different imaging sequences may be used to facilitate semi-automatic segmentation.
   * Ahmet and Jason will meet Chris Flask of imaging facilities during the week of October 28, 2013. A workable version of the imaging setting will be decided before the meeting.
   * Information on placement of registration markers should be included in specimen preparation.
Line 65: Line 61:
   * Information about specimen transportation (using the fixture made for previous studies) will be added.    * Information about specimen transportation (using the fixture made for previous studies) needs to be added.
Line 67: Line 63:
   * Specify target outcome.
   * The team will read and edit these specifications and complete them by the next meeting on Oct 29th.
   * Registration specifications and specimen preparation tasks were created.
   * Target outcome for robotics testing needs to be specified.
   * The team will read and edit these specifications to have a complete working edition by the next meeting on October 29, 2013.
   * Specification pages for registration specimen preparation tasks were created.
Line 72: Line 68:
   * Jason also created a test problem.
   * Details will be discussed with the Utah group on Oct. 23th.
   * The FEBio current feature request was deemed complete.
   * Jason also created a test problem to implement in situ strain feature..
   * Details of FEBio development will be discussed with the University of Utah group on October 23, 2013.
   * The task ''FEBio feature requests'' was deemed complete.
Line 76: Line 72:
   * Scott will start working on the Open Knee Generation 1 manuscript.
   * Ahmet will submit a one page manuscript to Journal of Medical Devices as part of ASME/FDA meeting.
   * Scott will start working on the Open Knee - Generation 1 manuscript.
   * Ahmet submitted a one page manuscript to Journal of Medical Devices as part of ASME/FDA meeting.
Line 79: Line 75:
   * FEBio summary was updated by Ben and Ahmet.
   * Will be discussed with the Utah group to complete the task.
   * Mechanical experimentation infrastructure task will be updated by Tara and Robb with relevant information about available equipment (including links).
   * FEBio summary was comupdated by Ben and Ahmet. The page will be discussed with the University of Utah group to complete the task.
   * Tara and Robb will work on the task ''Mechanical experimentation infrastructure'' by providing relevant information about available equipment (including links) in the wiki.
Line 83: Line 78:
  * Alternatives were discussed to keep the tissue experimentation cost to the minimum without limiting the data that can be acquired for the study.
  * The minimum number of samples that need to be tested is 18 for each specimen. With a 3 hr of testing time and $100/ hr of machine time, the minimum cost of one set of tests will be $5400, excluding the indirect costs.
  * Some alterations will also be made to the existing protocols to reduce test time.
  * Three alternatives were discussed to tr
y to circumvent this issue and provide more flexibility to the experimenters (with room for errors).
    * A fixed fee for the duration of the study with unlimited use of the testing equipment (indirect costs will apply).
    * Cost sharing for buying and maintaining new equipment with the robotics core.
    * Purchasing testing equipment for the grant (Ahmet had requested a quote from Biomomentum Inc.). This may be the cheapest option as no indirect costs will apply and experimenters will not be limited by cost of testing.
  * Ahmet, Snehal, Tara and Robb will meet next week to discuss the issue further and finalise a solution.
  * Alternatives were discussed to keep the tissue experimentation cost to a minimum without limiting the data that can be acquired for the study.
  * The minimum number of samples that need to be tested is 18 for each specimen. With 3 hour of testing time for each sample and $100/hour cost for machine time, the minimum cost of testing tissues for one knee specimen will be $5400, excluding the indirect costs.
  * Existing protocols may be modified to reduce testing time.
  * Three alternative
s were discussed to provide flexibility to the experimenters (accommodating room for errors).
   * A fixed fee for machine time, rather than an hourly fee, during the duration of the study for unlimited use of the testing equipment (indirect costs will apply).
   * Cost sharing for buying and maintaining new equipment with the !BioRobotics Core.
   * Purchasing testing equipment specifically for the project. Ahmet had requested a quote from Biomomentum Inc. This may be a cost-effective option as indirect costs will be limited and experimenters will not be limited by cost of machine time.
  * Ahmet, Snehal,
Tara and Robb will meet next week to discuss the issue further and finalize a solution.
Line 92: Line 87:
  * All task specifications development will continue.   * Development of all specifications will continue.
Line 95: Line 90:
  * Ahmet updated infrastructure/scripting environment information.   * Ahmet updated scripting environment information as part of infrastructure documentation.

Recurring Meeting of Cleveland Clinic Core Team

Date: October 22, 2013

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Jason Halloran
  3. Snehal Chokhandre
  4. Tara Bonner

Agenda:

  1. Discuss assigned tasks progress
  2. Discuss expected tissue testing expenses and potential purchasing of tissue testing equipment
  3. Decide action items for next meeting
  4. Other

Immediate Action Items:

See notes for details.

  • Snehal

    • Update specimen specification details and start order specimens after the specifications have been reviewed and agreed upon.
  • Ahmet

    • Share a copy of the quote with Snehal, Tara, and Robb for a tissue testing machine that may potentially be purchased.
    • Contact funding agency in regard to equipment purchase.
  • Tara

    • Provide Snehal a description of acceptable parameters for previously ordered specimens.
  • Jason

    • Complete a workable version of imaging settings before meeting with Chris Flask (scheduled during the week of October 28, 2013).
  • All

    • Read, review and modify time-sensitive specifications before next meeting.

Notes:

  1. Discuss assigned task progress.
    • Ahmet reviewed the minutes for last week's meeting.
    • Ahmet scheduled meetings with the Advisory Board during the week of October 28, 2013.
    • Ahmet, Jason, Snehal will meet Dr. Winalski on Monday, October 29, 2013 at 8:00 AM. Dr. Winalski can provide insight on anatomical imaging
    • Jason created a flowchart for experimental operations.
    • Specimen specifications
      • Specimen selection criteria was decided upon. Exclusion criteria from previous orders will also be checked.
      • Snehal will update the specifications and if possible, order the specimens this week.
      • Order, billing and delivery details will be updated.
      • Sub-sample details will be updated later pending development of other experimentation specifications.
    • Imaging specifications
      • Craig updated the page with previously used MRI specifications.
      • Craig found relevant references to improve the specifications to better suit segmentation constraints. In this regard, different sets of acquisition settings will likely be tested. Different imaging sequences may be used to facilitate semi-automatic segmentation.
      • Ahmet and Jason will meet Chris Flask of imaging facilities during the week of October 28, 2013. A workable version of the imaging setting will be decided before the meeting.
      • Information on placement of registration markers should be included in specimen preparation.
      • Imaging settings must also focus on registration marker image quality along with the soft tissue.
      • Information about specimen transportation (using the fixture made for previous studies) needs to be added.
    • Robotics testing specifications
      • Target outcome for robotics testing needs to be specified.
      • The team will read and edit these specifications to have a complete working edition by the next meeting on October 29, 2013.
      • Specification pages for registration specimen preparation tasks were created.
    • FEBio feature specifications
      • Jason prepared a list of feature requests and created a priority list.
      • Jason also created a test problem to implement in situ strain feature..
      • Details of FEBio development will be discussed with the University of Utah group on October 23, 2013.
      • The task FEBio feature requests was deemed complete.

    • Publications
      • Scott will start working on the Open Knee - Generation 1 manuscript.
      • Ahmet submitted a one page manuscript to Journal of Medical Devices as part of ASME/FDA meeting.
    • Documentation
      • FEBio summary was comupdated by Ben and Ahmet. The page will be discussed with the University of Utah group to complete the task.
      • Tara and Robb will work on the task Mechanical experimentation infrastructure by providing relevant information about available equipment (including links) in the wiki.

  2. Discuss expected tissue testing expenses and potential purchasing of tissue testing equipment.
    • Alternatives were discussed to keep the tissue experimentation cost to a minimum without limiting the data that can be acquired for the study.
    • The minimum number of samples that need to be tested is 18 for each specimen. With 3 hour of testing time for each sample and $100/hour cost for machine time, the minimum cost of testing tissues for one knee specimen will be $5400, excluding the indirect costs.
    • Existing protocols may be modified to reduce testing time.
    • Three alternatives were discussed to provide flexibility to the experimenters (accommodating room for errors).
      • A fixed fee for machine time, rather than an hourly fee, during the duration of the study for unlimited use of the testing equipment (indirect costs will apply).
      • Cost sharing for buying and maintaining new equipment with the BioRobotics Core.

      • Purchasing testing equipment specifically for the project. Ahmet had requested a quote from Biomomentum Inc. This may be a cost-effective option as indirect costs will be limited and experimenters will not be limited by cost of machine time.
    • Ahmet, Snehal, Tara and Robb will meet next week to discuss the issue further and finalize a solution.
  3. Decide action items for next meeting
    • Development of all specifications will continue.
    • Check immediate action items for details.
  4. Other
    • Ahmet updated scripting environment information as part of infrastructure documentation.
    • Auxiliary software useful for model development were also listed by Ahmet.
    • Structure of source code repository is also being developed by Ahmet.