Recurring Meeting of Cleveland Clinic Core Team

Date: December 17, 2013

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Jason Halloran
  3. Craig Bennetts
  4. Snehal Chokhandre
  5. Robb Colbrunn
  6. Tara Bonner

Agenda:

  1. Discuss tasks progress.
  2. Discuss preparations for Martin Garon's visit and quotes for potential machine configurations.
  3. Discuss specimen transportation device design and imaging requirements.
  4. Decide tasks for the next meeting.
  5. Other.

Immediate Action Items:

Notes:

  1. Discuss tasks progress.
    • Immediate action items from the previous meeting were discussed.
      • Snehal confirmed the ordering of one specimen. The specimen has no visible signs of OA per Dr. Morgan and Dr. Andrish.
      • Jason tried contacting Tekscan, Inc. but has not received any replies yet.
      • Craig and Snehal contacted prototype lab for specimen transportation device design. Tony suggested using acrylic tubes available in exact size that will fit in the MRI knee coil.
    • Specifications for specimen preparation and registration.
      • All the team members will review the documents and make necessary edits.
    • Joint testing specifications.
      • Ahmet will review the document and make necessary edits.
    • Imaging specifications.
      • Snehal will add protocol specifications for 3D DESS and MESE.
      • Craig will review and edit the specifications and organize the page.
  2. Discuss preparations for Martin Garon's visit and quotes for potential machine configurations.
    • Snehal will prepare all test samples and keep all fixtures ready.
    • Robb will prepare desired machine configurations to discuss with Martin.
  3. Discuss specimen transportation device design and imaging requirements.
    • Craig and Snehal discussed design options with the prototype lab and were advised to use acrylic tube instead of PVC pipes.
    • Snehal ordered acrylic tube and end plates.
    • Components will be prepared by the prototype lab this week.
    • Once the device components are ready, Snehal will contact Chris and Shannon at the University Hospitals to schedule another imaging session.
    • 3D DESS and MESE protocols will be tested.
  4. Decide tasks for the next meeting.
    • See Immediate Action Items above.
  5. Other.
    • Ahmet prepared an image segmentation specifications page. The page is organized in a similar fashion as other specifications pages with target outcome, prerequisites and protocols. Procedures will include general purpose protocols, alternatives to reach the same output, and procedures optimized for specific tissues.

RecurringMeetings/2013-12-17 (last edited 2016-05-04 22:09:48 by localhost)