Differences between revisions 10 and 11
Revision 10 as of 2014-01-02 16:31:18
Size: 2489
Editor: snehalkc
Comment:
Revision 11 as of 2014-01-07 05:13:52
Size: 4823
Editor: snehalkc
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
  * Evaluate candiate specimen.   * Evaluate candidate specimen.
Line 56: Line 56:
    
Line 60: Line 61:
  * TBD   * Minutes from previous meeting were discussed.
  * once the team members review and agree upon the joint testing related specification, a review by community can be requested.
  * A regular delivery of information will need to be managed instead of releasing all the information at once.
   * To allow the audience to easily navigate through the pages, the front page of the Wiki will be reorganized.
   * Specific aims will be moved to the top of the page. Separate section for users and developers will be prepared with appropriate links.
   * A general description of the roadmap page will be added at the top of the page.
  * Snehal will request specimens for the additional 4 specimens and Tara will take over responsibility while Snehal is away.
  * The specimen transportation device components were prepared by the prototype lab and will be assembled and tested in the next few days.
   * Once the device is ready Jason or Craig will contact the MRI facility to schedule the next imaging test session.
   * MESE, 3D-DESS protocols will be tested.
  * In the meantime Craig will reorganize the imaging specifications page.
  * Snehal will request Izzy to help with tissue testing machine ordering.
  * Ahmet, Robb and Snehal will meet to discuss the camera calibration issues sometime in February.
  * The necessary accessories for the tissue testing machine ( clamps, heater-thermocouple) will be designed/ bought by end of February.
  * Snehal and Tara will meet up and discuss the tissue testing preparation specifications (Sampling/ cutting).
  * Ahmet informed the Stanford team about the bugs in task display.
  * An abridged version of the data-structure document will be developed for this project in particular.
  * Description of the robot and other testing equipment specifications will be clearly described in a separate document and added to the infrastructure page.
  * Ahmet edited the joint testing specifications page. Remaining queries will be addressed by team members.
  
 
Line 62: Line 83:
  * TBD   * Craig and Tara conducted hands-on trial on the effect of curing of bone cement with alternative marker materials and found all the samples to be non-reactive.
  * Action items from previous meetings will be discussed next week to cover all the assigned work that was delayed due to winter break.
Line 65: Line 88:
Line 66: Line 90:
  * TBD.   * None noted.

Recurring Meeting of Cleveland Clinic Core Team

Date: December 31, 2013

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Snehal Chokhandre
  3. Craig Bennetts
  4. Tara Bonner

Agenda:

  1. Discuss tasks progress.
  2. Discuss immediate action items from previous meeting.
  3. Decide tasks for the next meeting.
  4. Other.

Immediate Action Items:

  • Ahmet

    • Organize front page to delineate general description, description for users, and description for developers.
  • Snehal

    • Evaluate candidate specimen.
    • Request four additional specimens for prospective purchase.
    • Schedule trial imaging session.
  • Tara

    • Follow up with the order of additional specimens if they qualify.
  • Craig

    • Update imaging specifications for organization and interactions with imaging facility personnel.
  • Jason

    • Utilize previous data on knee joint testing to quantify the influence of skin and surrounding tissue on joint kinematic-kinetic response.
  • Craig and Jason

    • Take over interactions with the imaging facility during Snehal's absence.
    • Ask Chris Flask about appropriate documentation of imaging settings using OAI manuscript as example.
  • Ahmet

    • Follow up with Izzy Delgado-Dembie to purchase tissue testing system.
  • Robb and Tara

    • Design and outfit clamps and containers (+heater) for new tissue testing system.
    • Provide general description of testing equipment along with sampling frequency, resolution, range, etc in the ["Infrastructure/ExperimentationMechanics"].
    • Explicitly state what measurements are recorded and provided.
  • Snehal and Tara

    • Meet and discuss tissue preparation procedures, in particular sampling and cutting.
  • All

    • Specimen preparation and registration pages need to be reviewed by all members promptly to launch the pages for public review
    • Experimentation wiki page on joint mechanics needs to be reviewed by all members promptly to launch the page for public review
    • Refer to immediate action items from Dec 17th for other incomplete duties.

Notes:

  1. Discuss tasks progress.
    • Minutes from previous meeting were discussed.
    • once the team members review and agree upon the joint testing related specification, a review by community can be requested.
    • A regular delivery of information will need to be managed instead of releasing all the information at once.
      • To allow the audience to easily navigate through the pages, the front page of the Wiki will be reorganized.
      • Specific aims will be moved to the top of the page. Separate section for users and developers will be prepared with appropriate links.
      • A general description of the roadmap page will be added at the top of the page.
    • Snehal will request specimens for the additional 4 specimens and Tara will take over responsibility while Snehal is away.
    • The specimen transportation device components were prepared by the prototype lab and will be assembled and tested in the next few days.
      • Once the device is ready Jason or Craig will contact the MRI facility to schedule the next imaging test session.
      • MESE, 3D-DESS protocols will be tested.
    • In the meantime Craig will reorganize the imaging specifications page.
    • Snehal will request Izzy to help with tissue testing machine ordering.
    • Ahmet, Robb and Snehal will meet to discuss the camera calibration issues sometime in February.
    • The necessary accessories for the tissue testing machine ( clamps, heater-thermocouple) will be designed/ bought by end of February.
    • Snehal and Tara will meet up and discuss the tissue testing preparation specifications (Sampling/ cutting).
    • Ahmet informed the Stanford team about the bugs in task display.
    • An abridged version of the data-structure document will be developed for this project in particular.
    • Description of the robot and other testing equipment specifications will be clearly described in a separate document and added to the infrastructure page.
    • Ahmet edited the joint testing specifications page. Remaining queries will be addressed by team members.
  2. Discuss immediate action items from previous meeting.
    • Craig and Tara conducted hands-on trial on the effect of curing of bone cement with alternative marker materials and found all the samples to be non-reactive.
    • Action items from previous meetings will be discussed next week to cover all the assigned work that was delayed due to winter break.
  3. Decide tasks for the next meeting.
    • See Immediate Action Items above.
  4. Other.
    • None noted.

RecurringMeetings/2013-12-31 (last edited 2016-05-04 22:09:52 by localhost)