Differences between revisions 1 and 2
Revision 1 as of 2014-01-20 19:42:32
Size: 705
Editor: aerdemir
Comment:
Revision 2 as of 2014-01-21 16:34:22
Size: 1566
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 1. TBD  1. Ahmet Erdemir
 1. Jason Halloran
 1. Robb Colbrunn
 1. Tara Bonner
Line 26: Line 29:
 * TBD
  * TBD
 * Tara
  * Specimen preparation page needs to have a description or a link on why the knees will be tested as intact.
  * Start addressing Ahmet's comments on tissue sample preparations.
 * Robb
  * Update infrastructure page on tissue testing including the testing device and necessary accessories (remains from previous meeting notes).
 * Craig
  * Reflect discussions on stepwise procedures in the imaging specifications page.
  * Move imaging facility related information to infrastructure pages.
 * Craig and Jason
  * Test transportation device fitting.
 * All
  * Alternatives of pressure measurement systems as Tekscan Inc. is not responsive.
  * Elaborate on the need of pressure measurement to potentially replace it with kinematics based contact distribution estimation (or to remove).

Recurring Meeting of Cleveland Clinic Core Team

Date: January 21, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Jason Halloran
  3. Robb Colbrunn
  4. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Discuss progress of all other tasks.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

  • Tara
    • Specimen preparation page needs to have a description or a link on why the knees will be tested as intact.
    • Start addressing Ahmet's comments on tissue sample preparations.
  • Robb
    • Update infrastructure page on tissue testing including the testing device and necessary accessories (remains from previous meeting notes).
  • Craig
    • Reflect discussions on stepwise procedures in the imaging specifications page.
    • Move imaging facility related information to infrastructure pages.
  • Craig and Jason
    • Test transportation device fitting.
  • All
    • Alternatives of pressure measurement systems as Tekscan Inc. is not responsive.
    • Elaborate on the need of pressure measurement to potentially replace it with kinematics based contact distribution estimation (or to remove).

Notes:

  1. Discuss immediate action items from the last meeting.
    • TBD
  2. Discuss progress of all other tasks.
    • TBD
  3. Decide immediate action items for the next meeting.
    • TBD
  4. Other.
    • TBD

RecurringMeetings/2014-01-21 (last edited 2016-05-04 22:09:48 by localhost)