Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2014-04-01 10:43:26
Size: 931
Editor: aerdemir
Comment:
Revision 5 as of 2014-04-01 16:09:17
Size: 1540
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
 * TBD
  * TBD
 * Craig
  * Provide headers of dicom files from the last imaging trial (March 20, 2014).
 * Snehal
  * Setup Mach-1 mechanical testing system installation and training.
 * Jason
  * Continue updating pressure measurement calibration specifications.
 * Snehal, Elvis, and Ahmet
  * Meet to discuss tissue sample preparation, tissue testing protocols, and constitutive modeling specifications.
 * Ahmet and Robb
  * Discuss with Robb if multiple heaters at different locations can be used for temperature control.
  * Discuss documentation of gravity and inertia compensation in load transducer of robotics testing.

Recurring Meeting of Cleveland Clinic Core Team

Date: April 1, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. TBD

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Evaluation of readiness for mechanical joint testing.
  3. Update on data management specifications (Including new in-house Midas installation).
  4. Decide immediate action items for the next meeting.
  5. Other.

Immediate Action Items:

  • Craig
    • Provide headers of dicom files from the last imaging trial (March 20, 2014).
  • Snehal
    • Setup Mach-1 mechanical testing system installation and training.
  • Jason
    • Continue updating pressure measurement calibration specifications.
  • Snehal, Elvis, and Ahmet
    • Meet to discuss tissue sample preparation, tissue testing protocols, and constitutive modeling specifications.
  • Ahmet and Robb
    • Discuss with Robb if multiple heaters at different locations can be used for temperature control.
    • Discuss documentation of gravity and inertia compensation in load transducer of robotics testing.

Notes:

  1. Discuss immediate action items from the last meeting.
    • TBD
  2. Evaluation of readiness for mechanical joint testing.
    • TBD
  3. Update on data management specifications (Including new in-house Midas installation).
    • TBD
  4. Decide immediate action items for the next meeting.
    • TBD
  5. Other.
    • TBD

RecurringMeetings/2014-04-01 (last edited 2016-05-04 22:09:48 by localhost)