Differences between revisions 14 and 15
Revision 14 as of 2014-12-09 16:14:21
Size: 2074
Editor: aerdemir
Comment:
Revision 15 as of 2014-12-09 16:17:52
Size: 2145
Editor: aerdemir
Comment:
Deletions are marked like this. Additions are marked like this.
Line 35: Line 35:
  * Order necessary laboratory supplies for joint and tissue testing.

Recurring Meeting of Cleveland Clinic Core Team

Date: December 9, 2014

Time: 10:30 AM EST

Means: In person meeting

Attendees:

  1. Ahmet Erdemir
  2. Craig Bennetts
  3. Snehal Chokhandre
  4. Robb Colbrunn
  5. Tara Bonner

Agenda:

  1. Discuss immediate action items from the last meeting.
  2. Discuss oks003 testing/data.
  3. Decide immediate action items for the next meeting.
  4. Other.

Immediate Action Items:

  • Snehal
    • Setup MRI with new registration markers.
    • Devise a protocol for testing of new registration markers (with MRI and with Optotrak probing).
    • Order a new knee from a young male donor.
    • Schedule MRI for the next four months.
    • Order necessary laboratory supplies for joint and tissue testing.
  • Robb
    • Organize SimVitro repository including Open Knee(s) specific changes to allow tracking of data collection software used in Open Knee(s) based on repository revisions.

    • Follow up the freezer or power failure contingency plan.
    • Conduct post-experiment pressure sensor calibration for oks003.
  • Craig
    • Evaluate oks003 MRIs and provide images in the specimen page.
  • Tara
    • Evaluate oks003 laxity data and provide images in the specimen page.
  • Ahmet
    • Confirm that ten points were probed for each registration marker of all oks specimens.
  • Robb and Tara
    • Evaluate cadaver specimen database to see if there are any knees that can be used for Open Knee(s) testing practice (January testing).
    • Follow up on SimVitro configuration file documentation.

  • Snehal and Craig
    • Come up with a labeling convention for secondary tissues in relation to data management specifications.
  • All
    • Remember to place all oks specimen and testing photos (from cameras and personal devices) at the in-house data management system.

Notes:

  1. Discuss immediate action items from the last meeting.
    • TBD
  2. Discuss oks003 testing/data.
    • TBD
  3. Decide immediate action items for the next meeting.
    • TBD
  4. Other.
    • TBD

RecurringMeetings/2014-12-09 (last edited 2016-05-04 22:09:52 by localhost)