Date:
2010-07-15 20:56 |
Priority:
3 |
State:
Open |
|
Submitted by:
Ajay Seth (aseth)
|
Assigned to:
Nobody (None)
|
Summary:
Tool/Analysis time range confusion |
Detailed description |
|
Tools and some analyses (such as IVD) specify the time range and it is not clear if both are necessary and which takes precedence. |
|